28 results (0,13087 seconds)

Brand

Size

Merchant

Price (EUR)

Reset filter

Products
From
Shops

Aquasol SoluGap Water Soluble Socket Weld Spacer Rings Thickness 1/16" Diameter Nominal 32 (Pack of 1000)

Aquasol SoluGap Water Soluble Socket Weld Spacer Rings Thickness 1/16" Diameter Nominal 32 (Pack of 1000)

Upgrade your socket welding process with the revolutionary Aquasol SoluGap Water Soluble Socket Weld Spacer Ring. This innovative product eliminates the need for pre-measuring and guesswork, ensuring consistent and reliable welds every time. Crafted from environmentally friendly, water-soluble composite material, SoluGap dissolves completely after welding, leaving behind a clean and flawless joint. Benefits Improved Weld Quality: Achieve consistent and reliable welds with every socket weld joint Enhanced Efficiency: Eliminate pre-measuring and simplify the welding process, saving time and effort Reduced Costs: Minimise rework and material waste due to improper weld gaps Increased Safety: Ensure the integrity of critical systems and components with reliable welds Environmentally Conscious Choice: Minimise environmental impact with water-soluble composite material Features Maintains Precise Gap: SoluGap provides the crucial 1/16" (1.6 mm) gap required for proper socket weld alignment, preventing cracking and loss of weld integrity Eliminates Pre-Measuring: Say goodbye to time-consuming measurements and guesswork. SoluGap simplifies the process, guaranteeing consistent weld gaps Easy Installation: Simply insert SoluGap into the socket weld fitting before welding. No tools or additional steps required Clean Removal: After welding, SoluGap dissolves entirely in most liquids, allowing for effortless post-weld clean-up Environmentally Friendly: Made from water-soluble composite material, SoluGap is an eco-conscious choice for your welding needs Applications Food Processing: Maintain sanitary standards with clean, precise welds in food processing equipment Pharmaceutical: Ensure the integrity of pharmaceutical pipelines with consistent and reliable welds Nuclear and Aeronautical: Meet stringent safety requirements with high-quality welds in critical applications Petrochemical Plants and Refineries: Enhance safety and efficiency in petrochemical environments with reliable welds Industrial Hydraulics: Ensure fluid flow and system integrity with consistent weld gaps in hydraulic systems Water Heaters and Boilers: Maintain the integrity of water heating and boiler systems with reliable welds Railroad Air Brake Piping: Ensure the safety of railroad braking systems with precise and dependable welds Shipbuilding: Build sturdy and seaworthy vessels with consistent and reliable welds Fertiliser Plants: Maintain the integrity of fertiliser production and storage systems with clean and strong welds Breweries: Ensure the quality and consistency of beer production with reliable welds in brewing equipment Instructions 1. Position ring by aligning outer edge with inner pipe circumference. 2. Slide ring inside pipe so tabbed edges can fit snugly and snap-in-place, maintaining the 1/16? or larger gap while avoiding compression. 3. Once secured inside the pipe, ring will stay in place, even when the socket is sideways or inverted. 4. Tack weld 3 or 4 times maintaining proper interpass temperature, as specified by ASME B31.3 or welding engineer. 5. Square up the pipe after the first tack. 6. Proceed to weld without exceeding interpass temperature. 7. Introduce hot or cold water to dissolve and remove its entire contents, leaving no residue in the pipe or if preferred, simply leave the spacer in the pipe as no adverse effects will result.

GBP 3399.99
1

Aquasol Pro Ox-100 Programmable Oxygen Monitor Kit with Bluetooth

Aquasol Pro Ox-100 Programmable Oxygen Monitor Kit without Bluetooth

Aquasol I-Purge Modular Inflatable Bladder System 203mm

Aquasol I-Purge Modular Inflatable Bladder System 203mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 949.99
1

Aquasol I-Purge Modular Inflatable Bladder System 152mm

Aquasol I-Purge Modular Inflatable Bladder System 152mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 919.99
1

Aquasol I-Purge Modular Inflatable Bladder System 1067mm

Aquasol I-Purge Modular Inflatable Bladder System 1067mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 2599.99
1

Aquasol I-Purge Modular Inflatable Bladder System 457mm

Aquasol I-Purge Modular Inflatable Bladder System 457mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 1299.99
1

Aquasol I-Purge Modular Inflatable Bladder System 1016mm

Aquasol I-Purge Modular Inflatable Bladder System 1016mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 2699.99
1

Aquasol I-Purge Modular Inflatable Bladder System 1168mm

Aquasol I-Purge Modular Inflatable Bladder System 1168mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 2999.99
1

Aquasol I-Purge Modular Inflatable Bladder System 711mm

Aquasol I-Purge Modular Inflatable Bladder System 711mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 1699.99
1

Aquasol I-Purge Modular Inflatable Bladder System 356mm

Aquasol I-Purge Modular Inflatable Bladder System 356mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 1199.99
1

Aquasol I-Purge Modular Inflatable Bladder System 305mm

Aquasol I-Purge Modular Inflatable Bladder System 305mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 1049.99
1

Aquasol I-Purge Modular Inflatable Bladder System 51mm

Aquasol I-Purge Modular Inflatable Bladder System 51mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 1029.99
1

Aquasol I-Purge Modular Inflatable Bladder System 610mm

Aquasol I-Purge Modular Inflatable Bladder System 610mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 1499.99
1

Aquasol I-Purge Modular Inflatable Bladder System 254mm

Aquasol I-Purge Modular Inflatable Bladder System 254mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 1029.99
1

Aquasol I-Purge Modular Inflatable Bladder System 127mm

Aquasol I-Purge Modular Inflatable Bladder System 127mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 799.99
1

Aquasol I-Purge Modular Inflatable Bladder System 965mm

Aquasol I-Purge Modular Inflatable Bladder System 965mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 2299.99
1

Aquasol I-Purge Modular Inflatable Bladder System 762mm

Aquasol I-Purge Modular Inflatable Bladder System 762mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 1899.99
1

Aquasol I-Purge Modular Inflatable Bladder System 1118mm

Aquasol I-Purge Modular Inflatable Bladder System 1118mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 2699.99
1

Aquasol I-Purge Modular Inflatable Bladder System 914mm

Aquasol I-Purge Modular Inflatable Bladder System 914mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 2099.99
1

Aquasol I-Purge Modular Inflatable Bladder System 508mm

Aquasol I-Purge Modular Inflatable Bladder System 508mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 1499.99
1

Aquasol I-Purge Modular Inflatable Bladder System 406mm

Aquasol I-Purge Modular Inflatable Bladder System 406mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 1199.99
1

Aquasol I-Purge Modular Inflatable Bladder System 76mm

Aquasol I-Purge Modular Inflatable Bladder System 76mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 899.99
1

Aquasol I-Purge Modular Inflatable Bladder System 660mm

Aquasol I-Purge Modular Inflatable Bladder System 660mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 1739.99
1

Aquasol I-Purge Modular Inflatable Bladder System 1219mm

Aquasol I-Purge Modular Inflatable Bladder System 1219mm

Introducing the Aquasol I-Purge Modular Inflatable Bladder System, the revolutionary solution for achieving high-quality welds while minimising purge gas consumption and saving you time and money. This innovative system utilises a series of inflatable bladders to create an airtight seal within pipes, effectively isolating the welding zone from oxygen and other contaminants. Benefits Achieve consistently high-quality welds with minimal oxidation Reduce purge gas consumption and save money Improve welding efficiency and productivity Minimise downtime and maximise uptime Enhance safety by reducing exposure to hazardous gases Features Modular design allows for easy customization to fit pipes of various sizes and configurations Durable, high-temperature construction withstands the rigors of industrial welding applications Inflatable bladders ensure a tight seal, minimising purge gas consumption and maximizing weld quality Lightweight and portable design facilitates easy transport and setup Reusable construction offers long-lasting value and reduces environmental impact Application Purging pipes and vessels prior to welding Isolating valves and tanks for maintenance and inspection Sealing pipe systems for cleaning and testing Protecting pipes from corrosion and contamination Instructions 1. Ensure I-Purge is fully assembled (i. e modules are securely connected to harness using quick connect fittings) . 2. If necessary, connect rope, chain, or wire to the pull loops on the ends of the bladder modules. This will allow easy insertion and removal of the system. 3. Connect inert gas lines to the BLUE and BLACK hoses. BLUE gas hose is required to inflate the purge bladders. BLACK gas hose is optional to expedite the purging process. 4. Position the purge unit in the pipe using the luminescent indicator as a guide to center the system across the root gap. 5. Turn the gas supply on to inflate the bladders and purge the weld zone. Recommended Flow Rates for Purging: BLUE gas hose should transfer inert gas at 10-32 SCFH (5-15 LPM) for models 2? 34? and 60 SCFH (28. 5 LPM) for models 36? 48? 6. Once a tight seal has been achieved, commence welding while maintaining flow rate. Recommended Flow Rates During Welding: BLUE gas hose should transfer inert gas at 15-30 SCFH (7. 5-15 LPM) 7. After the weld is complete, turn off the gas supply to deflate the bladders. Once the heat zone has sufficiently cooled, remove I-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 8. Clean I-Purge and store in the provided carrying bag when it is not in use. What's In The Box Inflatable Bladders Modules A & B High Heat Extended Harnesses Quick Connect Interchangeable Fittings Proprietary Relief Valve Inert Gas Diffuser Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Pull Loops Carrying Bag I-Purge Isolator Inflatable Pipe Stopper & Single Purge Bladder Ordering Part No. DimensionsStandard Harness LengthDescriptionEnglishMetricEnglishMetricABLD 22?51 mm11?279 mm2? I-Purge Double Purge Bag System with High Heat HarnessABLD 33?76 mm11?279 mm3? I-Purge Double Purge Bag System with High Heat HarnessABLD 44?102 mm11?279 mm4? I-Purge Double Purge Bag System with High Heat HarnessABLD 55?127 mm11?279 mm5? I-Purge Double Purge Bag System with High Heat HarnessABLD 66?152 mm11?279 mm6? I-Purge Double Purge Bag System with High Heat HarnessABLD 88?203 mm11?279 mm8? I-Purge Double Purge Bag System with High Heat HarnessABLD 1010?254 mm12?305 mm10? I-Purge Double Purge Bag System with High Heat HarnessABLD 1212?305 mm12?305 mm12? I-Purge Double Purge Bag System with High Heat HarnessABLD 1414?356 mm16?406 mm14? I-Purge Double Purge Bag System with High Heat HarnessABLD 1616?406 mm16?406 mm16? I-Purge Double Purge Bag System with High Heat HarnessABLD 1818?457 mm16?406 mm18? I-Purge Double Purge Bag System with High Heat HarnessABLD 2020?508 mm18?457 mm20? I-Purge Double Purge Bag System with High Heat HarnessABLD 2222?559 mm18?457 mm22? I-Purge Double Purge Bag System with High Heat HarnessABLD 2424?610 mm18?457 mm24? I-Purge Double Purge Bag System with High Heat HarnessABLD 2626?660 mm20?509 mm26? I-Purge Double Purge Bag System with High Heat HarnessABLD 2828?711 mm20?509 mm28? I-Purge Double Purge Bag System with High Heat HarnessABLD 3030?762 mm20?509 mm30? I-Purge Double Purge Bag System with High Heat HarnessABLD 3232?813 mm20?509 mm32? I-Purge Double Purge Bag System with High Heat HarnessABLD 3434?864 mm20?509 mm34? I-Purge Double Purge Bag System with High Heat HarnessABLD 3636?914 mm20?509 mm36? I-Purge Double Purge Bag System with High Heat HarnessABLD 3838?965 mm36?914 mm38? I-Purge Double Purge Bag System with High Heat HarnessABLD 4040?1016 mm36?914 mm40? I-Purge

GBP 2999.99
1